Laboratory technician preparing samples for testing

Testing coordination

Testing by accredited or recognised laboratories working to ISO/IEC 17025, only where it is needed.

What it involves

Existing test reports are reviewed first. They are accepted when they are no older than one year for food products or two years for non-food products, from the date of issue.

Where there are no valid reports, samples drawn during inspection are tested by an accredited or recognised laboratory based on the ISO/IEC 17025 standard. The results are reviewed with the inspection report.

Why it matters

Testing after arrival takes time, and goods are stored while it happens. Valid existing reports are used where possible, so products are not retested without need.

Who may need it

From report review to results

Reports reviewed

Submitted test reports are checked for validity and relevance.

Samples drawn

If there are no valid reports, samples are taken during inspection.

Laboratory testing

An accredited or recognised ISO/IEC 17025 laboratory tests the samples.

Results reviewed

A pass leads to a CoC; a fail leads to corrective action or an NCR.

Test report validity

If results fail

Outcome

Test results that are reviewed with the inspection report to reach the certification decision.

About ISO/IEC 17025

ISO/IEC 17025:2017 sets general requirements for the competence, impartiality and consistent operation of testing and calibration laboratories. Accreditation bodies, regulators and laboratory customers use it to confirm that a laboratory can produce technically valid results.

General industry context. It describes the standard or term, not a CERTECH accreditation.

Questions

Yes, if they are within the validity period: one year for food products, two years for non-food products, from the date of issue.

Accredited or recognised laboratories based on the ISO/IEC 17025 standard. We confirm the arrangements for your product when we review your request.

If corrective action is possible and acceptable, a CoC can still be issued. Otherwise, a Non-Conformity Report is issued.

Stacked shipping containers beneath a port crane

Planning a shipment of regulated goods?